MECHANICAL AND FIRE ENGINEERING

LIST OF COMPLETED PROJECTS ON MECHANICAL AND FIRE ENGINEERING SERVICES

 – INCLUDING HIGH SECURITY AND NATIONAL KEY POINTS ELECTRONICS INFRASTRUTURES:

Item Project Title Project Classification Scope of Work and Service (Work Stages Appointed For) Ward Date Completion Date
1 Pretoria: The Design of Fire Systems covering High-Risk Areas, Passages and Lobbies for Buildings at CSIR Scientia Campus Science Research Complex Fire Detection

– Stage 1 to 4 – (Designs, Tender)

Jul 2018 Dec 2018
2 DELTA Park High School Educational Facilities – School Renovation Mechanical and Fire Engineering Services Renovation & Repairs – Fire Protection, Hose Rails, Air Conditioning and Ventilation Installation- Stage 3 to 6 – (Designs, Installation Inspection and Management) 8 Nov 2012 July 2017
3 Durban Station Master Plan Implementation Game Ware House and Offices High Secured Complex for Import and Stock Warehouse WET services (Hot and Cold-Water Reticulation), Ventilation (Fresh Air Supply and Smoke Extraction)

Air Conditioning Services, Fire Rational Design, Fire detection system, Fire Protection (Hose Reels, Hydrants, Portable Fire Extinguishers and Sprinklers System), Municipal and Fire Authority Plan Approvals.  – Stage 1 to 6 – (Designs, Inspection and Management)

3 JUN 2012 DEC 2016
4 PRASA CRESS: Park Station: – Lifts and Escalators National Transportation Hub – Important and Complex Projects The works include the replacement or upgrade of 7 goods, 10 passenger lifts and 8 escalators. Electrical Distribution Boards, Electrical Reticulation and Subvisible Water Pumps for the lifts Jul 2012 23rd Jun 2016
5 Eskom Limpopo Operating unit Jane Furse CNC Office Complex Air Conditioning Systems, Fire Engineering, HVAC, Extraction and Ventilation. – Stage 1 to 3 – (Inception, Preliminary and Detail Design Documentation) 15th Mar 2013 25th Jan 2016
LIST OF COMPLETED PROJECTS ON MECHANICAL AND FIRE ENGINEERING SERVICES

 – INCLUDING HIGH SECURITY AND NATIONAL KEY POINTS ELECTRONICS INFRASTRUTURES:

Item Project Title Project Classification Client Scope of Work and Service (Work Stages Appointed For) Ward Date Completion Date
6 Eskom Limpopo Operating unit New Botlokwa (Matoks) CNC Office Complex Eskom SOC LTD – Limpopo Operating Unit Air Conditioning Systems, Fire Engineering, HVAC, Extraction and Ventilation. – Stage 1 to 3 – (Inception, Preliminary and Detail Design Documentation) 15th Mar 2013 25th Jan 2016
7 Eskom Limpopo Operating unit: Siloam CNC Office Complex Eskom SOC LTD – Limpopo Operating Unit Air Conditioning Systems, Fire Engineering, HVAC, Extraction and Ventilation. – Stage 1 to 3 – (Inception, Preliminary and Detail Design Documentation) 13th May 2013 25th May 2015
8 Magudu Secondary School Educational Facilities – Schools Programme Independent Development Trust (IDT) – Mpumalanga Region Laboratory Equipment’s, Chemical Fume-Cupboards, Kitchen Equipment’s, Ventilation, HVAC, Halls Air Extraction and or Ventilations

. Stages 1 to 6 – (Designs, Inspection and Management)

24 Jul 2008 Sept 2010
9 Pretoria:  DHA: Erf 5220: 909 Arcadia Street (FSI Buildings) Proposed Acquisition of Ministry Offices High Risk Area and National Key Points National Department of Public Works and Infrastructure Water Reticulation (Cold & Hot), Fire Engineering, HVAC, Extraction and Ventilations, Hoist Lifts for People with Special Needs. – Stage 1 to 6 – (Designs, Installation Inspection and Management) Feb 2010 – June 2010
10 Ellis Park / Doornfontein Station Local Main Transportation Hub – Important and Complex Projects Passenger Rail Of South Africa Air Conditioning Systems, Fire Engineering, Emergency Preparedness Plan, HVAC, Extraction and Ventilation. – Stage 1 to 6 – (Designs, Installation Inspection and Management) 30th Sep 2010 24th June 2009
11 Daveyton Station Upgrade Local Transportation Hub – Important and Complex Projects Passenger Rail Of South Africa Air Conditioning Systems, Fire Engineering, Emergency Preparedness Plan, HVAC, Extraction and Ventilation. Stage 3 to 6 – (Designs, Installation Inspection and Management) 7th Nov 2007 19th Dec 2009